Time-Constrained Participatory Budgeting Under Uncertain Project Costs

Video #1 Video #2 Download BibTeX Cite

Proceedings of the Thirty-First International Joint Conference on Artificial Intelligence. Main Track. Pages 74-80.

https://doi.org/10.24963/ijcai.2022/11

Abstract

In participatory budgeting the stakeholders collectively decide which projects from a set of proposed projects should be implemented.

This decision underlies both time and monetary constraints.

In reality it is often impossible to figure out the exact cost of each project in advance, it is only known after a project is finished.

To reduce risk, one can implement projects one after the other to be able to react to higher costs of a previous project.

However, this will increase execution time drastically.

We generalize existing frameworks to capture this setting, study desirable properties of algorithms for this problem, and show that some desirable properties are incompatible.

Then we present and analyze algorithms that trade-off desirable properties.

  1. [Aziz and Shah, 2021] Haris Aziz and Nisarg Shah. Partici- patory budgeting: Models and approaches. In T. Rudas and P. Gábor, editors, Pathways between Social Science and Computational Social Science: Theories, Methods and In- terpretations, pages 215-236. Springer, 2021.
  2. [Aziz et al., 2018] Haris Aziz, Barton E. Lee, and Nimrod Talmon. Proportionally representative participatory bud- geting: Axioms and algorithms. In Proceedings of the 17th International Conference on Autonomous Agents and Mul- tiAgent Systems, pages 23-31. IFAAMAS, 2018.
  3. [Baumeister et al., 2020] Dorothea Baumeister, Linus Boes, and Tessa Seeger. Irresolute approval-based budgeting. In Proceedings of the 19th International Conference on Au- tonomous Agents and MultiAgent Systems, pages 1774- 1776. IFAAMAS, 2020.
  4. [Bertsimas and Sim, 2004] Dimitris Bertsimas and Melvyn Sim. The price of robustness. Operations research, 52(1):35-53, 2004.
  5. [Fiat and Woeginger, 1998] Amos Fiat and Gerhard J. Woeg- inger. Online Algorithms: The State of the Art, volume 1442. Springer, 1998.
  6. [Goerigk et al., 2015] Marc Goerigk, Manoj Gupta, Jonas Ide, Anita Schöbel, and Sandeep Sen. The robust knapsack problem with queries. Computers & Operations Research, 55:12-22, 2015.
  7. [Gomez et al., 2016] Javier Gomez, D. Rios Insua, and César Alfaro. A participatory budget model under un- certainty. European Journal of Operational Research, 249(1):351-358, 2016.
  8. [Hans et al., 2007] Erwin W. Hans, Willy Herroelen, Roel Leus, and Gerhard Wullink. A hierarchical approach to multi-project planning under uncertainty. Omega, 35(5):563-577, 2007.
  9. [Kellerer et al., 2004] Hans Kellerer, Ulrich Pferschy, and David Pisinger. Knapsack Problems. Springer, 2004.
  10. [Ma et al., 2016] Weimin Ma, Yangyang Che, Hu Huang, and Hua Ke. Resource-constrained project schedul- ing problem with uncertain durations and renewable re- sources. International Journal of Machine Learning and Cybernetics, 7(4):613-621, 2016.
  11. [Monaci and Pferschy, 2013] Michele Monaci and Ulrich Pferschy. On the robust knapsack problem. SIAM Jour- nal on Optimization, 23(4):1956-1982, 2013.
  12. [Monaci et al., 2013] Michele Monaci, Ulrich Pferschy, and Paolo Serafini. Exact solution of the robust knapsack prob- lem. Computers & Operations Research, 40(11):2625- 2631, 2013.
  13. [Moradi and Shadrokh, 2019] Hadi Moradi and Shahram Shadrokh. A robust scheduling for the multi-mode project scheduling problem with a given deadline under uncer- tainty of activity duration. International Journal of Pro- duction Research, 57(10):3138-3167, 2019.
  14. [Peters and Skowron, 2020] Dominik Peters and Piotr Skowron. Proportionality and the limits of welfarism. In Proceedings of the 21st ACM Conference on Economics and Computation, pages 793-794, 2020. Extended version arXiv:1911.11747.
  15. [Pierczyński et al., 2021] Grzegorz Pierczyński, Piotr Skowron, and Dominik Peters. Proportional participatory budgeting with additive utilities. Advances in Neural Information Processing Systems, 34, 2021.
  16. [Pindyck, 1993] Robert S. Pindyck. Investments of uncertain cost. Journal of Financial Economics, 34(1):53-76, 1993.
  17. [Rad and Levin, 2006] Parviz F. Rad and Ginger Levin. Project Portfolio Management: Tools and Techniques. In- ternational Institute for Learning, 2006.
  18. [Stolicki et al., 2020] Dariusz Stolicki, Stanisław Szufa, and Nimrod Talmon. Pabulib: A participatory budgeting li- brary. arXiv preprint arXiv:2012.06539, 2020.
  19. [Talmon and Faliszewski, 2019] Nimrod Talmon and Piotr Faliszewski. A framework for approval-based budgeting methods. In Proceedings of the 33rd AAAI Conference on Artificial Intelligence, volume 33, pages 2181-2188. AAAI Press, 2019.
  20. [Vaziri et al., 2007] Kabeh Vaziri, Paul G. Carr, and Linda K. Nozick. Project planning for construction under uncer- tainty with limited resources. Journal of Construction En- gineering and Management, 133(4):268-276, 2007.

References were extracted automatically from the PDF and may contain errors.

Welcome Future Conferences AI Journal Division IJCAI Proceedings About IJCAI IJCAI Awards